Dongguan, China · machining since 2008
Precision parts, measured before they leave the shop.
Tight-tolerance CNC machining, wire and sinker EDM, and a measuring room with a Renishaw probe head — under one roof, in our own shop.
- ±0.002 mm achievable on milled features
- First article measured on the CMM before the run continues
- Dimensional report with actual values, as a PDF, on request
Hero photo to come
Capabilities
Six capabilities, and one honest exception
Pick one. Five of these happen entirely on our own machines in Dalingshan Town, Dongguan. The sixth — surface finishing — is only partly ours, and the panel says exactly which part.
Milling
32 machining centres — 13 four-axis, 13 three-axis, 6 two-axis. This is where most toleranced work happens: bores, fits, seal faces, flatness.
- ±0.002 mm achievable on milled features
- Unmarked dimensions to DIN ISO 2768-m
- Part envelope up to roughly 800 × 600 × 500 mm
- Aluminium, stainless, tool steel, titanium, brass, engineering plastics
Turning
Eight CNC lathes for shafts, pins, bushings, adapters and sealing features, with second operations on the mill when the part needs them.
- Turned diameters from 3 mm to 250 mm
- Threads cut, not formed, where the drawing calls for it
- Concentricity checked against the drawing datum
Wire EDM
Six wire EDM machines for shapes a cutter cannot produce — sharp internal corners, thin webs, and material already through heat treatment.
- Sharp internal corners with no corner radius
- Hardened steel cut after heat treatment
- Profiles taken straight from DXF or STEP
Sinker EDM
Six sinker EDM machines for blind pockets, keyways and cavities with no tool access. Electrodes are made here, on our own machines.
- Blind features and square-bottomed pockets
- Electrodes made in-house, on our own machines
- Used mainly on hardened tool steel
Measuring room
A coordinate measuring machine with a Renishaw PH10M probe head. Every production run starts here: the first part off the machine is measured before the rest is cut.
- First-article inspection before the run continues
- Report gives actual, nominal, upper and lower tolerance and deviation per feature
- Delivered as a PDF — ask for it with the order
- If a toleranced feature is out, you get a phone call, not a box of scrap
Finishing
Tumbling and deburring happen on our own two machines. Anodising, black oxide, plating, blasting, polishing and powder coating run at shops we work with — we organise it, and we tell you so you know where the part goes.
- Tumbling (stone-wash) in-house, two machines
- Anodising, plating, blasting, coating coordinated outside
- One supplier, one invoice, one delivery
What we hold
The features people actually buy from us
Toleranced work is most of what runs here. These are the things that usually decide whether a part is accepted or sent back.
Fits and bores
Mark the fit on the drawing and it is measured on the CMM against that fit, not eyeballed with a caliper.
Seal faces and flatness
Faces that have to seal get measured for flatness against the drawing datum before the run continues.
Concentricity and runout
Turned and milled features on the same part are checked against the datum the drawing specifies.
Threads
Cut rather than formed where the drawing requires it, so the thread form matches what you specified.
Sharp internal corners
Where a cutter would leave a radius, the corner is cut on wire EDM instead.
Hardened material
Tool steel is machined after heat treatment on wire and sinker EDM, so the tolerance survives hardening.
Our shop
Forty CNC machines and thirty-six people, in one building
We started in 2008 and we have stayed a machine shop. Nobody here forwards your drawing to somebody else and adds a margin — the machines below are ours and the people running them are on our payroll.
- 32CNC machining centres — 13 four-axis, 13 three-axis, 6 two-axis
- 8CNC lathes for turned and threaded work
- 12EDM machines — 6 wire, 6 sinker, for hardened material and sharp corners
- 4Engineers on staff, who read the drawing before a price goes out
| Qty | Machine |
|---|---|
| 32 | CNC machining centres — 13 × 4-axis, 13 × 3-axis, 6 × 2-axis |
| 8 | CNC lathes |
| 6 | Wire EDM (WEDM) |
| 6 | Sinker EDM |
| 4 | Punching machines, plus forming and welding |
| 2 | Tumbling machines (stone-wash) |
| 4 | Engineers on staff |
Materials
What runs here regularly
These move through the shop all the time. If your material is not on the list, that is not a no — ask.
| Material no. | Designation | Also known as |
|---|---|---|
| 3.3211 | EN AW-6061 · AlMg1SiCu | AA 6061 |
| 3.2315 | EN AW-6082 · AlSi1MgMn | AA 6082 |
| 3.4365 | EN AW-7075 · AlZn5,5MgCu | AA 7075 |
| 3.3547 | EN AW-5083 · AlMg4,5Mn0,7 | AA 5083 |
| 1.4301 | X5CrNi18-10 | AISI 304 |
| 1.4404 | X2CrNiMo17-12-2 | AISI 316L |
| 1.0038 | S235JR | St 37-2 |
| 1.0570 | S355J2 | St 52-3 |
| 1.7225 | 42CrMo4 | AISI 4140 |
| 1.2379 | X153CrMoV12 | AISI D2 |
| 2.0401 | CuZn39Pb3 | Ms58 |
| 2.0065 | Cu-ETP | C11000 |
| 3.7035 | Ti Grade 2 | R50400 |
| 3.7165 | TiAl6V4 | Ti Grade 5 |
Engineering plastics
Material sourcing and certificates
Bar and plate come from suppliers in Guangdong. For EN 10204 3.1 certified material we order against the certificate and pass it through with the parts. Please state this with the enquiry — certified stock takes longer to arrive.
Surface finishing — tumbling is ours, the rest is coordinated
Inspection & documents
What we measure, what you get on paper, and what we cannot give you
Read the right-hand column before you order. We would rather lose the enquiry than the order.
✓What you get
- Achievable milling accuracy ±0.002 mm
- on milled features — not on every feature of every part. Mark the tight ones on the drawing; without a mark we work to DIN ISO 2768-m.
- First-article inspection, every production run
- The first part is measured on the coordinate measuring machine before the rest of the run is cut. This is not an extra you order; it is how we work.
- Dimensional report
- Actual value, nominal, upper and lower tolerance and the deviation for each measured feature, tied to the part and the measuring programme it came from. PDF. Ask for it with the order — it does not happen automatically.
- EN 10204 3.1 material certificate
- on request, with batch / heat number, ordered against the certificate and passed through with the parts. Certified stock has a longer lead time, so say so with the enquiry.
- An engineer's opinion before you commit
- If a tolerance is tighter than the function needs, we say so. Loosening one dimension often costs less than the whole rest of the part.
- Drawing and data confidentiality
- Your files go to nobody outside the shop. NDA on request, before you send anything.
!What we do not have
- No ISO 9001 certificate
- We are not currently certified. No certificate does not mean unprofessional — it means you judge us by the part and the report, not by the binder. If your supplier approval requires the certificate, we would rather tell you now than after the order.
- No EMPB to VDA Volume 2, no PPAP
- We do not produce formal first-article reports in the automotive formats. A normal dimensional report you can have; those two you cannot.
- No 5-axis simultaneous machining
- Our centres are 2-, 3- and 4-axis. A part that genuinely needs simultaneous 5-axis work is not for us, and we will say so when we see the drawing rather than find out on the machine.
Process
How a job runs, start to finish
Six steps. No portal to sign up for, no account to open.
You send the drawing
STEP, IGES, X_T, DWG, DXF or PDF, with the quantity and the material.
- Mark the tolerances that actually matter
- Say if you need a certificate or a report
An engineer reads it
Four engineers on staff. Questions come back to you before a price goes out.
- Features that will make the part expensive get flagged
- Over-tight tolerances get questioned, not silently priced in
Quote
Price, lead time, and what is and is not included. Usually within one working day.
- No account to open
- No minimum order quantity
First article
The first part off the machine goes to the measuring room before anything else is cut.
- Measured on the CMM against your drawing
- Out of tolerance means a phone call, not a shipment
The run
Production continues once the first article is signed off, with in-process checks on the toleranced features.
- Tumbling and deburring in-house
- Outside finishing organised and tracked by us
Report and shipping
The dimensional report goes out as a PDF if you asked for it, with the parts.
- DHL, FedEx or UPS on your account or ours
- Or delivered to your forwarder in Shenzhen
Send the drawing. We will tell you what we can hold.
Price, lead time, and an engineer's opinion on the tolerances — usually back within one working day.
FAQ
Questions we get asked
How tight a tolerance can you really hold?
What exactly is in the dimensional report?
Is the first article measured on every job?
Are you ISO 9001 certified?
Do you machine hardened material?
What is the minimum order?
Who actually makes the parts?
Will you sign an NDA?
Contact
Talk to us
Send the drawing and the quantity. If something is unclear we ask rather than guess.
- eileen@gymachining.com
- Phone / WhatsApp
- +86 137 9012 4916
- Address
- 2nd Floor, Hongfu Building, No. 45 Lianma Road,
Dalingshan Town, Dongguan, Guangdong 523129, China - Hours
- Mon–Fri 08:00–23:00 Dongguan time (GMT+8)
- Quote turnaround
- Usually one working day